Embassy of the Republic of Poland

Embassy of the Republic of Poland
Arcadia had been approached by the Administration staff of the Embassy of Poland, Bangkok; to put forth for their consideration a Project/ Construction Management Proposal for the fitting-out of their new Chancery of Embassy of the Republic of Poland located in the Athenee Tower with areas of approximately 700 sq.m. The fit-out for this project was to procure a Design and Construction package.Design & Construct (D&C) bid packages. The scope of project management involves Pre-Construction stage, Construction stage, Commissioning, Operation, and Defect rectification. The Pre-Construction stage consists of contractors Pre – qualifications, bid invitation, assessments and contract negotiation & award of design and construct contractors to undertake the project. Followed by construction stage that involves site planning, construction supervision and contract administration for Embassy of Poland.

Arcadia PM/CM teams provided guidance and management to the D&C Contractor in the preparation of their Testing & Commissioning Procedure Plans, Operations & Maintenance Manuals leading up to the production and approvals of As-Built Drawings. Rigorous management during defects rectification and project accounting closeout processes was instrumental to the final handover of premises to the Embassy for further operations.

Facts + Figures
Location              Bangkok, Thailand
Sector                  Buildings
Market                 Commercial
Client                   The Embassy of the Republic of Poland
Appointment       2016
Completion         2016
Scope of Service
Project Management
Design Review
Pre-Construction to Procurement & Tender Evaluation
Contract Administration
Construction Management
Time, Cost, Quality, Risk & EHS Management
Commissioning
Operation
Defects Liability